Lone Star NGL Cryogenic Plant
Our Task
CCC Group was general contractor for the construction of a 250MM cf/d NGL cryogenic plant project, this included the piping scope.
Services Involved
- Underground piping installation
- Offload and handling of plant equipment
- All Equipment setting
- Open and inspect all equipment for service
- Load catalyst
- Offsite Fabrication of Piping and Structural Steel
- Installed structural steel and supports
- Installed @ 65,000lnft of rack and interconnecting piping
- Hydrotested vessels and piping, made ready for service
- Installed in line instrumentation
- Managed painting and insulation
- Commissioned plant and turn over to owner for start up
Client
Allied Equipment
Pettus, TX
Allied Equipment was formed in 1984 to service the oil and gas processing industry. Allied Equipment is most widely known as a leader in the design and manufacturing of modular gas treating and gas processing facilities.