Cooling Tower Sheet Pile Installation
  • Drove 1,300 linear feet of AZ26 x 70′ steel sheet piles for coffer cell
  • Fabricated and installed W33′ x 220 lbs per foot whaler and strut system 8 feet below water line
  • Coffer cell was required for the installation of 650′ of 10′ diameter HDPE piping system to allow recirculation canal to be closed for construction of new cooling tower

Project required two 230 ton cranes working simultaneously to minimize project duration.

Power Utility

Southeast U.S.

RELATED PROJECTS