Petrochem
CCC has a thorough understanding of the petrochem processes, maintenance, systems, work environments and unique requirements.
Our teams are flexible to adapt to your needs, operational goals and scopes of work.
- Mechanical
- Pipe Fabrication & Erection
- Specialty Fabrication (equipment & vessels)
- ASME Coded Repairs (U, S, R)
- Specialty Welding
- Structural Erection
- Rigging
- Concrete
- Civil (above & below ground)
- Heavy Demolition & Dismantle
- Electrical & Instrumentation
Specialized Petrochem Services
Capital Projects
We excel in civil, structural, electrical, instrumentation, equipment setting, piping and welding services. We understand as projects move from design to installation, they must move quickly and efficiently. CCC focuses on providing a strong team to support this effort. Through our alliances with like-minded support services, we can complete the project safely, with quality as a key premise, timely delivery of the completed work and remain determined to meet budget. Our team is up to the challenge for your next project.
Turnarounds and Shutdowns
By their very nature, turnarounds and shutdowns require an extremely fast paced work environment, all the while maintaining meticulous documentation of all tasks and accomplishments. We have continually proven that even in these intense projects, we maintain CCC’s high standards of safety and performance.
Maintenance & Supplemental Maintenance
Whether your facility needs a long term maintenance team or one to simply supplement your ongoing maintenance efforts, CCC is flexible to adapt to your needs.
Fabrication & Welding
Fabrication projects destined for the petrochem industry are continuously flowing through our shops. We provide services for capital projects such as vessels, structural iron, component pieces and piping systems. This allows synergies to develop in the field as CCC becomes the fabricator and installer. This lowers costs by reducing the number of groups involved in your project
Extractor Services
Distinct advantage for turnkey heat exchanger projects
Only self-propelled aerial extractor made
16 ≤ to 40 ≤ bundle carriage: 13 ≤ height
Will walk with 50 tons and will turn within its own length
Will pull 105 ≥ x 46 ≤ 50 tons
Extraction of bundles possible at elevations of 80 ≤ to 90 ≤ in the air