Back to CCC Group Home Page.Back to CCC Group Home Page. ENR 2010 Top 400 Firm

Fertilizer
 
Although the client list may not seem prolific, the dedication and commitment to these clients and their broad range of projects is without measure. CCC has formed client specific teams that have become an integral partner to these organizations when planning and executing facility improvements and when maintaining peak performance for their operations. 
 
  • The Mosaic Company 
  • CF Industries, Inc. 
  • PCS Phosphate
  • IMC Phosphates Company
  • Agrifos Fertilizer LLC
  • Cargill, Inc.  

CCC has proven to be a strong construction arm for several of the world’s leading fertilizer producers. With well over $100M worth of construction projects in the past 10 years, we have developed a keen ability in executing capital and maintenance projects for this industry.
 

From erecting draglines in their mines to working on the material handling systems, CCC has completed projects in every phase of their production process.
 

Every construction discipline is used. Best practices are implemented. Safety is never compromised and the highest quality standards are met.

Cross Country DAP Conveyor  
Florida

CCC Group was awarded the contract to replace an existing conveyor system with multiple transfer points with a 500’ enclosed conveyor system.
 
CCC was responsible:
  • Equipment Removal
  • Civil Work
  • Structural Fabrication, Assembly, and Installation
  • New Equipment Installation
  • Scheduling
  • System Start Up
 

After system start up, CCC was responsible for the tear down of the old existing conveyor, transfer towers, and take up tower. The bulk of the construction was completed during plant operation and system tie-in was accomplished during a scheduled plant outage of 10 days.

 

Dismantle & Rebuild of Two Draglines

Indiana to Florida
Washington

CCC Group was responsible for the complete dismantle and rebuild of two draglines.
 
The challenge in this project was to dismantle 2 draglines simultaneously. 
 

The scope of work included dismantle, transport and rebuild of the draglines. This involved supplying new tubs, backlegs, control systems and gearing as well as providing structural repairs and various upgrades.

 

Fertilizer Storage & Loadout System - EPC Project

Louisiana
 
Turnkey project, which entailed engineering, supplying and erecting complete fertilizer handling, storage and load-out systems. 
 
CCC was awarded a supply & erect equipment contract that included a new truck load-out facility with weigh scales, 7,000 lineal feet of material conveying equipment, a new 23,000-ton dry urea warehouse, a state of the art radial barge loader that eliminated the need for moving the barge during loading operations and a new automated rail car loading facility.
 
A unique aspect of the project included assembling the radial barge loader at a local fabricators shop up river from the site. After assembly, the barge loader was reloaded onto an awaiting barge for shipment back down river to the plant. Once the trip down river had been completed another barge was utilized that had been outfitted with a crane to set the preassembled loader in place.
 
Disciplines provided: civil, steel erection, mechanical (equipment setting) & electrical & instrumentation. 

 
 
 
 
 © 2008 CCC Group, Inc.